Skip to main content

Request for Proposal —
Marshall Petaluma Road MP8.24 Erosion Repair

General information

  • Department: Public Works
  • Category: Construction Services
  • Project description:

    The winter storms during February 2019 caused an embankment failure immediately below an existing retaining wall on Marshall Petaluma Road MP8.24. Work will generally include the installation a rip rap buttress along the slope starting from the bottom of the existing wall to the toe of slope of the creek. The width of the buttress will be approximately 75 feet wide. The existing voids along the slope will be filled with native soil and planted with willows and other native plants. The exposed concrete piers will be filled with grout. Construction for this project shall ONLY occur between June 15 and October 15 unless granted approval from the County. Nesting bird survey is required if work is to occur between February 15 to August 31. Coordination with the County will be required for nesting bird survey.

  • Project information:

    Electronic Bids to be submitted to via https://www.bidexpress.com/.

    If submitting sealed paper bids, please submit to the Director of Public Works via the administration desk at 3501 Civic Center Drive, Suite 304, San Rafael, CA 94903, on or before the date and time noted above, at which time bids will be publicly opened and read aloud on Zoom.

  • Delivery address:
    Rosemary Gaglione
    3501 Civic Center Drive, Suite 304
    San Rafael , CA 94903

Key dates

  • Issue date: Wednesday, April 10, 2024
  • Submission due by: Thursday, May 2, 2024, 3:00 pm
  • Question submittal date: Thursday, April 25, 2024, 3:00 pm

Additional information

  • Proposal number: 2019-21

 See all contracting opportunities.

Page updated May 3, 2024