Recent Activities
Of the 28 proposed units, 13 building permits have been issued, which are currently at various stages of construction. There are additional 15 building permits that have been reviewed and are currently in pre-issuance verification.
- Between March and October 2025, building permits for 13 of the units were issued.
- On September 11, 2023, the Planning Commission approved the Lucas Valley - Talus LLC Design Review via Resolution PC23-18. This is the entitlement for the properties identified as lots 1, 2, and 10-28
- On July 10, 2023, the Planning Commission approved the Lucas Valley - Talus LLC Design Review via Resolution PC23-016. This is the entitlement for the properties identified as lots 3-9.
About the Project
Address(es):
Various addresses for Erin Drive and Erin Court, San Rafael
Assessor's Parcel(s):
164-650-01 through -28
Project Contact(s):
| Contact | Name | Number |
|---|---|---|
| Property Owner | Lucas Valley - Talus LLC | NA |
| Applicant | Haven Development Company | 925-963-2115. Dial 711 for CA Relay. |
Project Description
The Legacy at Lucas Valley, located in the Marinwood community of unincorporated San Rafael, is a proposed 28-unit, single-family development, also known as the Talus Subdivision. The project includes two main streets located in the subdivision, known as Erin Drive and Erin Court. The project includes an affordable housing condition that requires six of the units to be sold at or below market rate.
Project Permits and Decision History
This section lists the documents for project approvals, decisions, and permits. This text section can be used to detail the entitlement and permitting history narrative ahead of listing the documents.
Planning Entitlements
- Lucas Valley - Talus LLC Design Review Approval - PC Resolution PC23-016, dated July 10, 2023. This is the entitlement for the properties identified as lots 3-9.
- Lucas Valley - Talus LLC Design Review Approval - PC Resolution PC23-018, dated September 11, 2023. This is the entitlement for the properties identified as lots 1, 2, and 10-28.
Construction Permits
- Building permits have been issued for 13 of the lots between March and November, 2024.
Construction History
- 10/20/25 Inspection Report (10/20/25)
- 11/3/25 Inspection Report (11/3/25)
- 11/14/25 Inspection Report (11/14/25)
- 12/5/25 Inspection Report (12/5/25)
- 12/12/25 Inspection Report (12/12/25)
- 12/19/25 Inspection Report (12/19/25)
- 01/02/26 Inspection Report (01/02/26)
- 01/12/26 Inspection Report (01/12/26)
- 01/16/26 Inspection Report (01/16/26)
- 01/23/26 Inspection Report (01/23/26)
- 01/30/26 Inspection Report (01/30/26)
- 02/09/26 Inspection Report (02/09/26)
- 02/13/26 Inspection Report (02/13/26)
- 02/23/26 Inspection Report (02/23/26)
- 02/27/26 Inspection Report (02/27/26)
- 03/06/26 Inspection Report (03/06/26)
- 03/13/26 Inspection Report (03/13/26)
- 03/20/26 Inspection Report (03/20/26)
- 03/26/26 Inspection Report (03/26/26)
- 04/06/26 Inspection Report (04/06/26)
- 04/10/26 Inspection Report (04/10/26)
- 04/17/26 Inspection Report (04/17/26)
- 04/24/26 Inspection Report (04/24/26)
- 05/01/26 Inspection Report (05/01/26)
- 05/08/26 Inspection Report (05/08/26)
- 05/15/26 Inspection Report (05/15/26)
- 05/22/26 Inspection Report (05/22/26)
- 05/29/26 Inspection Report (05/29/26)