destruction for spray treatment of in ground or aerial wasp nest posing significant hazard to public All public meetings and events sponsored or conducted by the County of Marin are held in accessible sites. Requests for accommodations may be made by calling (415) 473-4381 (Voice/TTY/CRS dial 711
Bugs All public meetings and events sponsored or conducted by the County of Marin are held in accessible sites. Requests for accommodations may be made by calling (415) 473-4381 (Voice/TTY/CRS dial 711) or by e-mail at disabilityaccess@marincounty.org at least five work days in advance. Copies
destruction for spray treatment of in ground or aerial wasp nest posing significant hazard to public All public meetings and events sponsored or conducted by the County of Marin are held in accessible sites. Requests for accommodations may be made by calling (415) 473-4381 (Voice/TTY/CRS dial 711
No No No Bed Bugs All public meetings and events sponsored or conducted by the County of Marin are held in accessible sites. Requests for accommodations may be made by calling (415) 473-4381 (Voice/TTY/CRS dial 711) or by e-mail at disabilityaccess@marincounty.org at least five work days in advance. Copies
No No No No Not Listed Insects, ants 13 Dominant Sodium tetraborate decahydrate a.i. = 5.4% Insecticide Caution 64405-23 No No No No Not Listed Insects, ants All public meetings and events sponsored or conducted by the County of Marin are held in accessible sites. Requests for accommodations may
at McInnis GC Pre-emergent used for the control of annual grasses, sedges, and broadleaf weeds All public meetings and events sponsored or conducted by the County of Marin are held in accessible sites. Requests for accommodations may be made by calling (415) 473-4381 (Voice/TTY/CRS dial 711) or by e-mail
most vulnerable to climate change strongly aligns with your Board’s equity goals. In Marin, low-income communities particularly vulnerable to sea level rise and flooding events include the low-lying San Rafael Canal neighborhood and Marin City. Low-income residents in Marin also face significant
of the event. We will do our best to fulfill requests received with less than five business days’ notice. Copies of documents are available in alternative formats upon request. Marin County Parks 3501 Civic Center Dr, Suite 260 San Rafael, CA 94903 www.marincountyparks.org IPM COMMISSION MEETING 10-25-24
at least five business days in advance of the event. We will do our best to fulfill requests received with less than five business days’ notice. Copies of documents are available in alternative formats upon request.
3501 Civic Center Dr, Suite 260 San Rafael, CA 94903 www.marinparks.org IPM COMMISSION MEETING 10-25-24 Above: Monthly volunteer events in January, February, and March, led to extensive progress in removing mature French broom plants from Bothin Marsh and the Mill Valley Pathway corridor, as well
with a disability and require an accommodation to participate in a County program, service, or activity, requests may be made by calling 415-473- 4381 (Voice), Dial 711 for CA Relay, or by submitting a Disability Accommodation Request at least five business days in advance of the event. We will do our best
and tide events Entire highway will be vulnerable to regular and severe inundation by 2045 Project Overview ▪ ▪ ▪ Conduct a sea level rise adaptation planning study along a 5.41-mile segment of Hwy 1 in Marin County near Bolinas Lagoon Project will include the development of technical climate change
transportation access along Olema Bolinas Road for the town of Bolinas during scenarios consisting of up to 5.5 feet of sea level rise and a 100-year storm event (8 feet combined). The project includes the following elements, which are summarized below and fully described in the Project Description section
in the hydrology calculations for the 10- and 100-year storm event are based on the Rational Method: 1.07 – 6.05 Intensity (Inches / hour, NOAA Atlas 14) 0.9 C-factor (Table C-1 McCuen 1989) 10 Time of Concentration (minutes) Closed channel flow analysis for the proposed storm drain pipe network was performed
for liquefaction to occur at depth, however, cannot be ruled out. To mitigate for the potential for liquefaction to occur during a large seismic event, bridge abutments founded on alluvial sediments should incorporate spread footings that are embedded a minimum of 4 feet below the ground surface. LOG JAMS
activities shall not occur for 24 hours after rain events that deliver >0.25 inches of rain without the presence of a full-time qualified biologist onsite to monitor activities. 11. Any open holes or trenches greater than 12 inches deep shall be covered or have escape ramps no steeper than 45 degrees
should include either designing the bridge to withstand flood waters impacting the bridge or accepting the risk for flooding to damage the bridge which would have to be repaired or replaced after a large flood event. The cost to design the bridge resist flooding will depend on the flood elevation level
flooding resulting from winter storm events and undersized culverts in the project area. In the study area, the alluvial fan surfaces of Wilkins Gulch and Lewis Gulch Creeks have for the most part been abandoned, except at their toes. Lewis and Wilkins Gulch Creek have been relocated against hill slopes
and provide education related to IPM, and perform services including trash cleanup, sheet mulching, hand-pulling, weed whipping. Above, this Mill Valley school group participated in a Russian thistle removal event. Marin County Integrated Pest Management 2023 Annual Report 4 2023 Labor Hours Overall
agreement requirements, including activities that subcontractors perform. In the event a grantee retains a contractor to accomplish any part of the project, the grantee is required to first enter into an agreement with each contractor requiring it and any subcontractors meet the audit, accounting
sites and would result in greater environmental impacts than would concrete spread footings. Waterways Consulting conducted a hydrologic and hydraulic analysis to quantify flow rates, associated water surface elevations, and other parameters associated with the 100-year return period storm event
Redwoods Loop, Ridge, and Mossy Rocks trails. The following conditions will be added to Mitigation Measure BIO-1: Identify and Protect Dusty-Footed Woodrat Nests in the event a dusky-footed woodrat house is found in the work area or adjacent to the work area. The trail or other project component would
California Bay trees (Umbellularia californica) within this preserve were large in both diameter at breast height (DBH) and height. Several of these individual trees appeared to have gone through many fire events, given the size of their burls 4 , which also lends to an inference about their age. Due
of droughts, floods, heat waves, and cold spells; to cause a rise in sea level and an increase in the intensity and frequency of extreme high-water events; to change the water levels and flow regimes in creeks and streams; increase the ability of species and vegetation types to expand their ranges
owls in high growth areas of the San Francisco Bay Area, and loss of burrowing owl habitat will likely continue well into the future (Townsend and Lenihan 2007). As urbanization increases and local burrowing owl populations decline, they become vulnerable to stochastic events (demographic, genetic