Request for Proposal —
RFP- REQUEST FOR PROPOSALS For ARCHITECTURAL & ENGINEERING SERVICES PLANNING & DESIGN DEVELOPMENT - 350 Ignacio Blvd. Tenant Improvement

General information

  • Department: Public Works
  • Category: Professional Services
  • Project description:

    The County of Marin (“County”) is seeking proposals from a qualified team of architects and engineers (“Consultant” or “Proposer”) to provide professional design, engineering and construction administration services for a tenant improvement project at 350 Ignacio Boulevard in Novato, California. The selected team will be expected to provide a coordinated, permit-ready and bid-ready design, support the County through bidding, and provide construction administration services through project closeout. 
    The project will adapt the recently acquired office building to support County operations and staff from University of California Cooperative Extension (UCCE), Agriculture Weights & Measures (AWM), and Health & Human Services (H&HS).  The work is intended to build upon the County’s November 2025 350 Ignacio Boulevard Facility Assessment Study prepared by DLR Group and its subconsultants. The study included facility assessment, programming, conceptual planning, engineering narratives, and probable cost development. The County intends for the selected Consultant to validate and advance that work. The target construction budget for this project is $4M.  
    The successful Proposer must be prepared to start work immediately upon contract award.  The delivery schedule for all services outlined in this RFP is expected to take up to 17 months with design taking approximately 5 months and construction beginning summer 2027. 

  • Delivery address:
    Tracie Holland
    3501 Civic Center Dr
    San Rafael , CA 94903

Key dates

  • Issue date: Tuesday, September 22, 2026
  • Submission due by: Tuesday, October 20, 2026, 5:00 pm

Additional information

  • Project information:

    You are hereby advised of the following revisions and/or clarifications to
    said Request for Proposal Documents:
    1. Page 1: Introduction final sentence has been updated to “The target
    construction budget for the project is $3M.”
    2. Page 2: Task 3 – Design Development & Permit Package has been
    updated to indicate OPC required at 30%, 60% and 90% completed
    documents.
    3. Page 5: Section 2 was previously mislabeled Section 3, it has been
    corrected.
    4. Page 10: Additional drawings were added for reference:
    a. 3rd Floor Tenant Improvement Plans from 2008
    b. 1st Floor Tenant Improvement Plans from 2008
    c. Structural Modification Plans from 2008
    d. Dropbox link to AutoCAD plans
    https://www.dropbox.com/scl/fo/th495dh909jx846y9eahl/AIpC_ngLIbM0VfcO38e3wv0?rlkey=r18ap1vn251dq4pj8dc7969jo&st=95tqrotl&dl=0
     

  • Attachments:

    The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tracie Holland or phone 415-473-4259. To use the California relay service, dial 711.

    • RFQ - REQUEST FOR PROPOSALS For ARCHITECTURAL & ENGINEERING SERVICES PLANNING & DESIGN DEVELOPMENT for the Tenant Improvement Project (60.01 MB) — The County of Marin (“County”) is seeking proposals from a qualified team of architects and engineers (“Consultant” or “Proposer”) to provide professional design, engineering and construction administration services for a tenant improvement project at 350 Ignacio Boulevard in Novato, California. The selected team will be expected to provide a coordinated, permit-ready and bid-ready design, support the County through bidding, and provide construction administration services through project closeout. The project will adapt the recently acquired office building to support County operations and staff from University of California Cooperative Extension (UCCE), Agriculture Weights & Measures (AWM), and Health & Human Services (H&HS). The work is intended to build upon the County’s November 2025 350 Ignacio Boulevard Facility Assessment Study prepared by DLR Group and its subconsultants. The study included facility assessment, programming, conceptual planning, engineering narratives, and probable cost development. The County intends for the selected Consultant to validate and advance that work. The target construction budget for this project is $4M. The successful Proposer must be prepared to start work immediately upon contract award. The delivery schedule for all services outlined in this RFP is expected to take up to 17 months with design taking approximately 5 months and construction beginning summer 2027.

    The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tracie Holland or phone 415-473-4259. To use the California relay service, dial 711.

    • RFP 350 IGNACIO DESIGN Addendum 1- FINAL.pdf (95.13 MB) — said Request for Proposal Documents: 1. Page 1: Introduction final sentence has been updated to “The target construction budget for the project is $3M.” 2. Page 2: Task 3 – Design Development & Permit Package has been updated to indicate OPC required at 30%, 60% and 90% completed documents. 3. Page 5: Section 2 was previously mislabeled Section 3, it has been corrected. 4. Page 10: Additional drawings were added for reference: a. 3rd Floor Tenant Improvement Plans from 2008 b. 1st Floor Tenant Improvement Plans from 2008 c. Structural Modification Plans from 2008 d. Dropbox link to AutoCAD plans https://www.dropbox.com/scl/fo/th495dh909jx846y9eahl/AIpC _ngLIbM0VfcO38e3wv0?rlkey=r18ap1vn251dq4pj8dc7969jo &st=95tqrotl&dl=0
  • Location:
    ,

 See all contracting opportunities.

Page last updated on October 12, 2026.