Pasar al contenido principal

Santa Venetia Floodwall Project

Resumen

Project Description

Description

The Marin County Flood Control District is proposing to construct a sheet pile floodwall along the top of the existing earthen levee, from 55 Meadow Drive, west of the Meadow Drive Bridge, to Pump Station 5, which is just east of 825 Vendola Drive. The total length of the floodwall would be about 7,800 feet, and the maximum width would be about 14 inches. The floodwall would be constructed of composite or steel sheet piles. At the seven locations where storm drain and sewer main outfalls pass beneath or over the levee, the Project would route the pipelines through the sheet pile wall and use a clay check dam or similar materials to provide continuous flood protection. The District’s objective for the Project is to provide protection for the Santa Venetia neighborhood from the 100-year flood for the 30-year design life of the Project. 

Review type

Mitigated Negative Declarations (MND), Subsequent Environmental Review (SER)

Estado

Active

Ubicación

Location

A residential neighborhood in Santa Venetia, located in unincorporated Marin County along the south bank of South Fork Gallinas Creek and an existing earthen levee from 55 Meadow Drive, west of the Meadow Drive Bridge, to Pump Station 5, which is just east of 825 Vendola Drive, San Rafael.

Other Project Contact

Robin Bartlett , Principal Engineer

Notice of Availability

Notice of Availability

The Marin County Flood Control District has completed a revised Draft Supplemental Environmental Review and Subsequent Mitigated Negative Declaration (SER/Subsequent MND) for the Santa Venetia Floodwall Project. The revised Draft SER/Subsequent MND is linked below in the "Environmental Review Materials" section near the bottom of this page. A previous version of the Draft SER/Subsequent MND was prepared in 2023 but was never certified; it is available for review below in the "2023/2024 Documents" section of this page. The revised Draft SER/Subsequent MND was prepared after minor design updates were made to the project. 

The 30-day public comment period for the Santa Venetia Floodwall Project Project revised Draft SER/Subsequent MND begins on Friday, August 28, 2026 and will end on Monday, September 28, 2026 at 4:00 p.m.

Please email your comments to the Environmental Planning Division before the end of the comment period deadline. The email address is listed on the Notice of Availability linked below. Any mailed comments must be postmarked on or before Monday, September 28, 2026 to the attention of Rachel Reid, Environmental Planning Manager, at 3501 Civic Center Drive, Suite 308, San Rafael, CA 94903.

The Draft SER/Subsequent MND has evaluated the project with respect to all the environmental topical areas of concern as listed in Appendix G of the California Environmental Quality Act (CEQA) Guidelines. The topical areas addressed include: 

  • Aesthetics; 
  • Agricultural and Forestry Resources; 
  • Air Quality; 
  • Biological Resources; 
  • Greenhouse Gas (GHG) Emissions and Energy; 
  • Geology and Soils; 
  • Hazards and Hazardous Materials; 
  • Hydrology and Water Quality; 
  • Land Use and Planning; 
  • Mineral Resources; 
  • Noise; 
  • Population and Housing; 
  • Public Services; 
  • Transportation; 
  • Cultural/Tribal Cultural and Historic Resources;
  • Utilities and Service Systems; and 
  • Wildfire.

If you challenge the decision on this proposed project in court, you may be limited to raising only those issues you or someone else raised at the public hearing, or in written correspondence delivered to the Community Development Agency, Planning Division during or prior to the public hearing (Government Code Section 65009(b)(2)).

Public Notice

Public Notice

Environmental Review Documents

The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tammy Taylor or phone 415-473-7873. To use the California relay service, dial 711.

  • Santa Venetia Floodwall - 2026 Draft SER (24.11 MB) — The 2026 revised Draft Supplemental Environmental Review and Subsequent Mitigated Negative Declaration for the proposed Santa Venetia Floodwall Project, a supplement to the 2019 Gallinas Levee Upgrade Initial Study/Mitigated Negative Declaration prepared for the project.

2023/2024 Documents

Optional Content

These documents were prepared in 2023 and 2024 for a previous version of the Draft SER/Subsequent MND that was never certified.

The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tammy Taylor or phone 415-473-7873. To use the California relay service, dial 711.

  • Santa Venetia Floodwall - Notice of Availability for 2023 Draft SER (0.02 MB) — The Notice of Availability for the Draft Supplemental Environmental Review and Subsequent Mitigated Negative Declaration for the proposed Santa Venetia Floodwall Project, a supplement to the 2019 Gallinas Levee Upgrade Initial Study/Mitigated Negative Declaration prepared for the project, stating that the public review period begins on Tuesday, December 12, 2023 and ends on Tuesday, January 16, 2024 at 4:00pm.
  • Santa Venetia Floodwall - 2023 Draft SER (10.38 MB) — The Draft Supplemental Environmental Review and Subsequent Mitigated Negative Declaration for the proposed Santa Venetia Floodwall Project, a supplement to the 2019 Gallinas Levee Upgrade Initial Study/Mitigated Negative Declaration prepared for the project.
  • Santa Venetia Floodwall - 2024 Response to Comments (6.57 MB) — A Response to Comments document prepared to address comments received on the 2023 Draft Supplemental Environmental Review and Subsequent Mitigated Negative Declaration (SER/Subsequent MND), which had a public review period from December 12, 2023 through January 16, 2024. The Response to Comments was prepared in 2024 but not previously released as the related SER/Subsequent MND was never certified.

Public Hearings

Related