Morning Phase LLC Coastal Development Permit and Coastal Variance (P5981)
Resumen
Main Component of the Project
Single-family Residence - Accessory StructureUbicación
40 Cliff Road
Assessor's Parcel
Estado
Applicant
Project Description
The applicant is requesting Coastal Development Permit approval to construct an 800 square foot detached residential accessory dwelling unit (ADU) on a developed lot in Bolinas. The applicant is also requesting a Coastal Variance for PG&E electrical flatform.
The 800 square feet of proposed development would result in a floor area ratio of 28 percent on the 4,938 square foot lot. It appears the proposed building would reach a maximum height of 15 feet above surrounding grade and the exterior walls would have the following setbacks: 18 feet, 10 ½ inches from the eastern front property line; over 75 feet from the southern side property line; 4 feet from the northern side property line; 4 feet from the western rear property line.
The PG&E electrical flatform would be 4 feet 6 inches long by 4 feet 8 inches wide. The PG&E electrical flatform would be 4 feet 8 inches above grade with the total structure height being 11 feet above grade 0 feet from the front property line. Various site improvements would also be entailed in the proposed development, including a firepit, a bench, new exterior stairs and railings, new pavers, a new water feature, a new gate, and remodel of the existing primary residence.
The project is not exempt from a Coastal Development Permit pursuant to Coastal Zoning Code section 20.68.0501.b. Variance approval is required because the PG&E electrical flatform structure is within the front setback.
Land Use Info
Zoning: C-RA-B2
Countywide Plan Designation: C-SF5
Community Plan (if applicable): Bolinas
Project Materials
Project Plans
The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email CDA Accessibility or phone 415-473-6269. To use the California relay service, dial 711.
- Morning PhaseCDPVR April Plans.pdf (67.69 MB) — Morning Phase LLC P5982 - Plans 04.06.26
- Geotech 1 (24.07 MB) — Geotechnical report on new ADU and property improvements.
- Geotech 2 (0.18 MB) — Geotechnical report - supplemental recommendations.
- Geotech Supplemental 2026.pdf (0.18 MB) — Geotechnical Report 2026