Resumen
Project Description
The Project includes modifications to the Building Bridge #2 (BB2) portion of the San Anselmo Flood Risk Reduction project and includes replacing an existing retaining wall along San Anselmo Avenue, adding abutments for a future pedestrian bridge, and possibly adding a temporary baffle.
Review type
AddendumsEstado
Ubicación
Assessor's Parcel Number (APN): 006-102-28
Address: 634-636 San Anselmo Ave., San Anselmo
Other Project Contact
Hugh Davis , Civil Engineer, Marin County Flood Control DistrictNotice of Availability
The Marin County Flood Control District has suspended the San Anselmo Flood Risk Reduction Project. The Draft Environmental Impact Report (EIR) Second Addendum (BB2) is linked below in the "Environmental Review Documents" section near the bottom of this webpage. The 30-day public comment period for the Draft EIR Second Addendum began on November 3, 2023 and ended on December 11, 2023.
Public Notice
- View Public Notice - Revised Notice of Availability
2023 EIR Second Addendum (BB2)
The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tammy Taylor or phone 415-473-7873. To use the California relay service, dial 711.
- SAFRR BB2 - Draft 2nd EIR Addendum (22.01 MB) — The draft of the second addendum for the 2018 Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project (Building Bridge #2).
2023 EIR First Addendum
The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tammy Taylor or phone 415-473-7873. To use the California relay service, dial 711.
- SAFRR - Draft 1st EIR Addendum (3.35 MB) — The draft of the first addendum for the 2018 Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project.
- SAFRR - 1st EIR Addendum Response to Comments (8.15 MB) — The Response to Comments document prepared after the public comment period for the draft first addendum for the 2018 Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project.
2018 EIR
The documents in this list may not work with all assistive technology and are being remediated. For alternative formats, please email Tammy Taylor or phone 415-473-7873. To use the California relay service, dial 711.
- SAFRR - Draft EIR (47.97 MB) — The draft of the Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project.
- SAFRR - Final EIR Volume 1, Part 1 (25.05 MB) — The final Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project, Volume 1, Part 1.
- SAFRR - Final EIR Volume 1, Part 2 (32.55 MB) — The final Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project, Volume 1, Part 2.
- SAFRR BB2 - Final EIR Volume 2 (44.80 MB) — The final Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project, Volume 2.
- SAFRR - Notice of Hearing for Final EIR (0.06 MB) — The public notice for the Marin County Board of Supervisors hearing to approve the final Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project.